The 3-step Z-Rack was built, designed, welded and installed by Gil Rey Garcia in April 2008. The soundtrack was edited to fit the video. Music by Monte Loco soundtrack available on iTunes.
http://www.youtube.com/watch?v=FN8nfCaEJMM&hl=en
Lowrider Truck Dancing Bed Nissan Mini Truck Hydraulics
5:55 AM
|
Labels:
Dancing,
Hydraulics,
Lowrider,
Nissan
|
This entry was posted on 5:55 AM
and is filed under
Dancing
,
Hydraulics
,
Lowrider
,
Nissan
.
You can follow any responses to this entry through
the RSS 2.0 feed.
You can leave a response,
or trackback from your own site.
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment